Auxiliary Equipment
Circuit breakers are necessary to deenergize equipment either for normal operation or on the occurrence of short circuits. Circuit breakers must be designed to carry normal-load currents continuously, to withstand the extremely high currents that occur during faults, and to separate contacts and clear a circuit in the presence of fault. Circuit breakers are rated in terms of these duties.
When a circuit breaker opens to deenergize a piece of equipment, one side of the circuit breaker usually remains energized, as it is connected to operating equipment. Since it is sometimes necessary to work on the circuit breaker itself, it is also necessary to have means by which the circuit breaker may be completely disconnected from other energized equipment. For this purpose disconnect switches are placed in series with the circuit breakers. By opening these disconnests, the circuit breaker may be completely deenergized, permitting work to be carried on in safety.
Various instruments are necessary to monitor the operation of the electric power system. Usually each generator, each transformer bank, and each line has its own set of instruments, frequently consisting of voltmeters, ammeters, wattmeters, and varmeters.
When a fault occurs on a system, conditions on the system undergo a sudden change. Voltages usually drop and currents increase. These changes are most noticeable in the immediate vicinity of fault. On-line analog computers, commonly called relays monitor these changes of conditions, make a determination of which breaker should be opened to clear the fault, and energize the trip circuits of those appropriate breakers. 'With modern equipment, the relay action and breaker opening causes removal of fault within three or four cycles after its initiation.
The instruments that show circuit conditions and the relays that protect the circuits are not mounted directly on the power lines but are placed on switchboards in a control house. Instrument transformers are installed on the high-voltage equipment, by means of which it is possible to pass on to the meters and relays representative samples of the conditions on the operating equipment. The primary of a potential transformer is connected directly to the high-voltage equipment. The secondary provides for the instruments and relays a voltage which is a constant fraction of voltage on the operating equipment and is in phase with it. Similarly, a current transformer is connected with its primary in the high-voltage circuit. The secondary winding provides a current which is a known fraction of the power-equipment current and is in phase with it.
Bushing potential devices and capacitor potential devices serve the same purpose as potential transformers but usually with less accuracy in regard to ratio and phase angle.
英语翻译类问题(电气工程类)
The system consists of an energy source, a prime mover, a generator, and a load.系统由一个能量源(即原动力转换装置)一个发电机,和一个负载组成。“ ,a prime mover,”是对energy source的进一步解释,相当于汉语中用括号对主词进行说明。The energy may be coal, gas, or oil burned ...
英语翻译类问题(电气工程类)
断路器是必要的deenergize设备都正常运作或发生短路。断路器的设计必须履行正常的负载电流不断,承受极高电流期间发生故障,并单独接触和明确的电路存在故障。断路器的额定在这些职责。当断路器打开deenergize一台设备,一方断路器通常仍然充满活力,因为它是连接到操作系统的设备。因为它有时需要工作断路器本身...
电气工程类专业英语翻译问题2
The battery polarities, of course, remain as they were according to their symbology (short end negative, long and positive). 当然,电池的极性根据它们的符号(短端为负,长端为正)而保持其原样。It is okay if the polarity of a resistor’s voltage polarity is correctly based on the...
电气工程专业英语 翻译1.有源元件能产生能量,而无源元件不能。 翻译2...
1. The active element can produce energy, and passive components can't.2. The first way, parallel shift means that the code of all digital output at the same time.望采纳谢谢
求电气工程类英文翻译。The firing of a transition t i removes a t...
什么是firing?firing就是单个的不可中断的步骤。什么是token?就是Petri网络里的有限个标志,我们就叫token令牌吧。什么是transition?就是节点发生的过渡过程。pre-places是指过渡过程发生之前的位置,叫先验位置 post-places是指过渡过程发生之后的位置,叫后验位置 所以,翻译如下:一个过渡过程ti的触发会...
电气工程及其自动化专业英语习题部分翻译
Diodes in power electronic applications carry high currents,withstand high reverse voltages and should possess fast switching characteristics.These requirements render power diodes very different than the ordinary signal diodes.It is also difficult to achieve all the above three characteristics in...
求一篇电气工程及其自动化专业的英语文章及翻译 谢谢
在中国,各级使用电压为10,35,110级高压, 220,中国330(仅在西北)和500千伏超高压类。The first 750 kVtransmission line will be built in the near future in Northwest China. 第一个750 kVtransmission线将建在不久的将来在中国西北地区。With the development of the AC\/DC converting equipment, high ...
电气工程类专业词汇翻译
Basic Electrical, Materials and Methods基本电气材料和方法 Grounding and Bonding接地及其连接 Electrical Hangers and Supports电气 支吊架 Electrical Identification电气 鉴定 Electrical Testing电气 检测 Conductors and Cables导体与电缆 Raceway and Boxes线槽及其接线盒 Utilities – Electrical\/Tele\/...
电气工程专业外语翻译
subtransmisson系统的传输功率的少量的传输的配电变电站变电站。大工业客户通常提供直接从subtransmission系统。在某些系统中,没有明确的分界线subtransmission和传输线路。当系统扩展和更高的电压水平是必要的,年长的输电线路往往归属于subtransmission功能。主要分布电压之间的典型4.0千伏及34.5千伏。小工业客户...
帮忙翻译电气工程及自动化的英语论文,只有一小段
以下翻译杜绝机译,请放心采用。In this winding system, we use Mitsubishi A series PLC as master station PLC because it has the characteristic of quick response and great ability of information processing. 在这一卷绕系统中,我们采用了三菱的A系列PLC(可编程控制器)作为主站控制器,因为它...