第1个回答 2009-05-05
五金件喷漆的工艺流程:
工件抛光、补坭子、打磨、喷淋清洁、手动除尘、自动除尘、喷底漆、冷流平、烘烤、下件检查(除不良)、自动除尘、喷面漆、烘烤、下件检查、包装。
各个流程的需花的时间按产线总长度、管理和技术力量恒定,按单件算,从工艺开始到结束一般在两个小时以内,补坭子、打磨占时最长,冷流平和烘烤6-12米/分钟乘9-15米。
英文本人的理解有限,不能够给你更好的帮助。你下个同步翻译试试。
高级工程师 祝你好运
第2个回答 2009-05-05
Hardware spray processes:
Workpiece polishing to make up for sub-Cement, polishing, spray cleaning, manual removal, automatic dust removal, paint spraying, cold flat, baking, the next thing to check (in addition to non-performing), automatic dust removal, paint spraying, baking, the next parts inspection and packaging.
Various processes to be the time spent by the total length of line, managerial and technical strength of a constant, by a single operator, from the beginning to the end of the general process in two hours to make up for sub-Nai, when accounting for the maximum polished, calm and dry cold bake 6-12 m / min by 9-15 meters.
第3个回答 2009-05-06
五金件喷漆的工艺流程:
工件抛光、补坭子、打磨、喷淋清洁、手动除尘、自动除尘、喷底漆、冷流平、烘烤、下件检查(除不良)、自动除尘、喷面漆、烘烤、下件检查、包装。
各个流程的需花的时间按产线总长度、管理和技术力量恒定,按单件算,从工艺开始到结束一般在两个小时以内,补坭子、打磨占时最长,冷流平和烘烤6-12米/分钟乘9-15米。
翻译如下:
Hardware spray processes:
Workpiece polishing to make up for sub-Cement, polishing, spray cleaning, manual removal, automatic dust removal, paint spraying, cold flat, baking, the next thing to check (in addition to non-performing), automatic dust removal, paint spraying, baking, the next parts inspection and packaging.
Various processes to be the time spent by the total length of line, managerial and technical strength of a constant, by a single operator, from the beginning to the end of the general process in two hours to make up for sub-Nai, when accounting for the maximum polished, calm and dry cold bake 6-12 m / min by 9-15 meters.