第1个回答 2010-01-17
Open computer keep ozone indoor air flow. In the case of the failure of gas supply should be immediately thermalsteam prevent ozone room intergradle hot, damaged ozone.
Every day when on prvent must be checked whether the device must be thermalsteam, prvent, wait until the issue is resolved before it can be turned on.
Leave room for the installation of the equipment, as well as easy to remove and repair, and compact, reasonable.
The complete set of equipment should be guaranteed gas pallets (valve control, ozonizer drive, valve must be open to the students) and the gas pipeline road, mensures antileakage, antiplugging.
If you are sure the device is properly installed and are familiar with the following content, you can make the device operations.
Check the air wasclear, is there any prvent. If it finds a problem to be solved.
1. the manual work
Power on: press the power button, power indicator light, voltmeter, indicates whether the current voltage, press the button, manually operating, manual lamp, ammeters operating current. Machine'bodywork started working.
Shut down manually: press the button, and the whole machine stopped working, and then press the power switch, turn off the power.
2. automatic work
Press the power button, power indicator light, voltmeter, indicates whether the current voltage, pressing work button, and then adjust the electronic time-controlled, the machine will be in accordance with regulation time. Ammeters operating current. To set the amount of time will stop working. Finally, press the power switch.
Regulation of time controller: S representative on behalf of the second, m, H represents hours minutes. On behalf of the time in front of the second cell in the Middle, that is, the latter two groups of fixed to 99. The machine work time in accordance with the regulation.
Flow control: clockwise regulation to reduce the volume of regulation to increase the flow and Eastern Hospital Road. Work flow open as the maximum value.
Temperature: the temperature control range 0-399-degree temperature, temperature control (the recommended is 60 degrees) when Cabinet temperatures exceed the adjusted temperature, the machine will automatically stop. The temperature inside the device power-down to the waterline before it can be turned on.
* the request for an execellency user vigilance:
But wary of gas source port blocking.! must ensure the smooth flow in a pipe, it is strictly forbidden that if gas source port or pipe blockage can cause damage. In spite of the efforts we have done, still ask you to respect the right to install, meiticulously action to stamp out the accident took place, make sure that the normal production.本回答被提问者采纳
第2个回答 2010-01-14
这段话翻译下来就是以下的了。。。
After opening the machine pay attention to maintaining smooth flow of ozone indoors. As part of the failure of gas supply should be immediately shut down to prevent the accumulation of ozone chamber heat, ozone damage to the original.
Device must be checked at boot time every day is leaking, if the leak must be shut down until the problem is resolved in order to boot.
The equipment installation should leave room for, both for the demolition and repair, but also compact and reasonable.
Set of equipment should ensure the smooth flow of gas path (valve control, ozone generator to open, the valve must be opened) and the gas line, pipeline leak need to be taken, aiming to halt the measure.
When you determine the equipment has been properly installed and are familiar with the following, you can operate the device.
Check gas line is clear, whether there is leakage areas. Found to the problem must be addressed.
1. Manual work
Power: Press the power button, power indicator light, voltage meter to indicate the current-voltage, press the manual button, machine work, hand indicator light, ammeter display operating current. Machine to work.
Shutdown: First press the manual button, machine stop working, and then press the power switch, shut off power.
2. Auto Work
Press the power button, power indicator light, voltage meter to indicate the current-voltage, press the button work automatically, and then adjust when the control electronics, the machine will adjust the time according to their work. Ammeter display operating current. To set the time will stop working. Finally press the power switch.
Time controller adjustment: S on behalf of seconds, M on behalf of minutes, H on behalf of an hour. Grid on behalf of the previous two hours, in the middle as a unit, followed by the two groups is fixed at 99. The machine work at the time of adjustment in accordance with the switch.
Flow Control: clockwise adjustment to reduce the flow counter-clockwise to increase the flow of conditioning. Open to the maximum hours of work flow.
Thermostat: Temperature range of 0 ---- 399 degrees (recommended temperature control temperature of 60 degrees) when the cabinet temperature exceeds a regulated temperature, the machine will automatically stop. To be the machine only after lowering the temperature inside the boot.
* Dear user to draw a high degree of vigilance:
. Prevent gas source port to plug! Must ensure smooth flow in the pipeline is strictly prohibited plug, if the gas supply port or pipeline blockage can cause equipment damage. Although we make every effort, is still to ask your side to respect the guidance, proper installation and careful operation, to prevent accidents and ensure normal production.
第3个回答 2010-01-21
After opening the machine pay attention to maintaining smooth flow of ozone indoors. 如供气部分发生故障应立即停机防止臭氧室积热,损坏臭氧发生原件。 As part of the failure of gas supply should be immediately shut down to prevent the accumulation of ozone chamber heat, ozone damage to the original.
第4个回答 2020-03-20
说明书中译英可以找北京译顶科技,价格方面会比翻译论文低一些,你可以去看看