When was the factory opened? Is the Building: Steel 0 Masonry 0 Others: Condition: AVERAGE
Factory layout
Comments:
Good 0 Average 0 Poor 0
Housekeeping
Good 0 Average 0 Poor 0
Size of Factory:
Monthly total output - Factory Declared:
Approved:
Pcs.
Total number of employees in this location:
a) QC’s (In-line / End-Line / Final): d) Production Workers:
b) Total QA (i.e. Auditor): e) Number of Sewing Lines:
c) Production Supervisors: f) Average Number of Sewers per line:
Q A Manager available? Reports to:
Does QA Manager have other responsibilities?
If yes, please clarify:
Does the factory have a generator?
Is the Quality Department independent of Production:
Factory Training:
a) Does the factory have a training scheme?
b) Do they keep Training / Skill records for each employee?
c) Does the factory have an internal or external technical training programs / courses?
d) How many operators are in the training? 2 – 4 worker under short term training each month
What other training does the factory give their employees? Not available
Initial attitude & concept of Management is: Satisfactory 0 Unsatisfactory 0
Is subcontractor being used?
If yes, please give details such as Name / Address & Products / Operations:
a) Does the factory test any Material, Accessories or Finished Product?
If yes, please describe what is being tested:
Checking color by light box Yes 0 No 0
b) Is there an In-house lab? If no, please list labs used for testing - If applicable: Yes 0 No 0
Labs used: Factory mainly use external labs for testing, they only equipped with light box for checking colors
If yes, please comment on Procedure & Equipment:
c) Does the factory have records of lab test results on all fabrics? Yes 0 No 0
Other components Yes 0 No 0
Garments Yes 0 No 0
COLOR & PRINTING PREPARATION: 0 Mark ( X ) if not applicable
Color sample, Lab dip, Strike-off preparation Yes 0 No 0
Yarn dyed knitdown, handloom preparation Yes 0 No 0
If no, please list source used:
If yes, please comment on Procedure & Equipment:
Documentation Acceptable 0 Unacceptable 0
Laboratory recipe: Acceptable 0 Unacceptable 0
Spectrophotometer:
Lead Time:
Yes 0 No 0
Light Box
If Yes, light source used: Ultralume 3000 0 D65 0 D75 0 Other:China Branded Machince
Yes 0 No 0
SAMPLING: 0 Mark ( X ) if not applicable
Pattern generation: Manual 0 Computerized 0
Pattern grading: Manual 0 Computerized 0
Marker making: Manual 0 Computerized 0
Marker duplication Manual 0 Computerized 0
Does the factory have a sample making or engineering department?
If no, please indicate the vendor they use:
Yes 0 No 0
Sample made in production line Yes 0 No 0